![]() |
BATHYMETRIC SURVEY OF RIVER SUIR CATCHMENT AREAKey Facts: Client: Office of Public works Client Requirements: The contract required the survey of approximately 215 Channel and Structures cross sections within the catchment and a depth survey of two small lakes. The survey data was required to fill-in gaps in the existing survey data held by the OPW and consequently the required cross sections were spread throughout the catchment. Murphy Surveys Solution: Due to the varying nature of requirements a combination of survey methods were utilised to capture the necessary information, this included
A number of crews were deployed to different areas so that the deadline would be adhered to which required careful planning and logistics.
|
|||||||||||